翻訳と辞書
Words near each other
・ KittiB
・ Kitticarrara Glacier
・ Kittie
・ Kittie Bruneau
・ Kittie discography
・ Kittie Doswell
・ Kittie Party
・ Kittiewan
・ Kittigazuit Formation
・ Kittikorn Liasirikun
・ Kittikun Jamsuwan
・ Kittikun Sriutthawong
・ Kittill Kristoffersen Berg
・ Kittilä
・ Kittilä Airport
Kittilä mine
・ Kittim
・ Kittima Sutanan
・ Kittinger
・ Kittinger Company
・ Kittiphong Pluemjai
・ Kittipol Paphunga
・ Kittipong Loon-jak
・ Kittipong Phuthawchueak
・ Kittipong Wachiramanowong
・ Kittipong Wongma
・ Kittipoom Paphunga
・ Kittiraj Sanor
・ Kittiratt Na-Ranong
・ Kittisak Hochin


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Kittilä mine : ウィキペディア英語版
Kittilä mine

Kittilä mine, also known as Suurikuusikko mine, is a gold mine in Kittilä, in the Lapland Province of Finland. The mine is owned and operated by Agnico-Eagle Mines Limited and is located north of Kittilä. Exploration began in 1986, and production started in 2008. The mine is composed of two open pits, with the proceeds of the operation funding an underground mining operation, accessed by a ramp from surface and utilizing both transverse and longitudinal long-hole stoping methods. The mine utilizes on-site concentrating to produce Doré bars for shipment off-site for refinement, and is scheduled to produce of gold in 2009.
==History==
In 1986 gold was discovered near the town of Kittilä. The Geological Survey of Finland initiated exploration which resulted in a discovery of gold mineralization. Diamond drilling continued up to 1991, when exploration ended. In 1998 the property was sold to Svenska Platina AB, a junior mining company which was a subsidiary of Riddarhyttan Resources AB. Permitting for an open pit mine began in 2002, with a mining licence and permit secured in 2003. Agnico Eagle purchased a stake in Riddarhyttan (at the time feasibility studies suggested the resource was between 2—3.7 million ounces of gold) in 2004, with the remainder of the company being purchased in 2005. Diamond drilling continued in 2005, with an additional 460 holes drilled over . In September 2008 an additional of drilling resulted in a gold reserve increase of two million ounces (5.7 million ounces total), over 18.2 million tonnes of ore, grading 5.12 grams per tonne. Excavation of the open pit began in September 2007 and ore production began in May 2008. Mining in the Suuri pit began at per day to be increased to by the end of 2009.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Kittilä mine」の詳細全文を読む